Most water damage events look dry long before the structural assemblies actually are. A room that smells fine and feels dry to the touch may have framing at 25-30% moisture content — well above the 6-12% target range required for true structural drying. COS Water Damage Restoration's Mico structural drying program is driven by daily psychrometric readings, not visual judgment.
The difference between structural drying done right and structural drying done fast is what ends up in your walls three months later.
Low-grain refrigerant (LGR) dehumidifiers operate more efficiently in the low-humidity conditions created by an active drying program than conventional dehumidifiers — achieving lower dewpoint conditions that accelerate evaporation from structural materials. Our Mico structural drying crews deploy properly sized LGR equipment based on the specific volume and material profile of your affected assemblies. Equipment sizing is calculated, not estimated.
Every active drying project in Mico receives a daily psychrometric reading session: temperature, relative humidity, specific humidity, grains per pound of moisture in the air, and moisture content readings at fixed sensor points in each structural assembly. These readings are logged and provided as documentation of the drying program for your insurance claim. Drying is declared complete only when readings at all sensor points fall within the target EMC range for the material species being dried.
The wall framing cavity is where water damage most often leads to long-term problems in Mico properties. After water events, wall cavities absorb moisture through both the drywall face and the framing itself — and standard floor-level drying equipment does not reach these cavities. Our Mico crew drills calibrated access ports at the base of affected wall sections and inserts directional air nozzles that force conditioned airflow through the cavity space, pairing it with LGR dehumidification to achieve complete cavity drying alongside floor-level assemblies.
Insurance-formatted drying documentation means faster settlement and fewer adjuster callbacks.
Here are the specific drying scenarios and assembly types our Mico team is equipped and trained to handle.
The most common drying failure in Mico water damage projects is a wall framing cavity left with elevated moisture content after surface materials are dry. Our Mico team uses calibrated cavity access — typically 1-inch drill holes at the base of the wall framing cavity — to introduce directed airflow from high-velocity air movers into the stud bay, paired with LGR dehumidification to extract the evaporated moisture. Moisture readings at framing sensor points confirm completion. Access ports are patched and filled after the program completes, typically leaving no visible trace of the access procedure.
Subfloor and hardwood drying in Mico is species-specific and requires daily monitoring of cupping and moisture gradient.
Crawlspace saturation after a water event in Mico often goes undetected — we include it in every below-grade moisture mapping session.
Water that migrates down from an upper floor or a roof intrusion in a Mico property saturates ceiling drywall and the framing above it — areas that are impossible to reach with standard floor-level equipment. Our Mico team installs ceiling injection ports and directs positive-pressure airflow through ceiling cavities, combined with LGR dehumidification of the affected room air space. Ceiling drywall that cannot be dried to target moisture content is removed — rather than left to become a mold substrate — and documented in the scope for replacement.
Large-scale commercial drying in Mico is project-managed from day one with zone-specific reading logs.
Every active structural drying program in Mico is also a mold prevention program — because the conditions that support mold growth (elevated moisture content in organic materials and elevated relative humidity in the air space) are exactly the conditions a drying program is designed to eliminate. Our daily reading sessions include assessment of the ambient RH and temperature conditions in each drying zone against the threshold conditions that support mold colonization. If readings suggest an elevated mold risk — particularly in projects where extraction was delayed — we address it proactively with targeted antimicrobial treatment during the active drying program.


Equipment before mapping is guesswork. Mapping before equipment is science.
Equipment placement is engineered based on the moisture map and assembly data — not placed by habit.
Daily readings, daily reporting, daily equipment adjustment if needed — documented throughout.
Completion is confirmed by instruments and documented in writing. No visual estimates.



"We'd had a water damage company dry our house after a previous event and they removed equipment on day 5 and called it done. Three months later, mold behind the walls. This time I specifically chose COS Water Damage Restoration because of their documentation process. Daily readings, specific sensor point data, instrument-confirmed completion. No mold, no callbacks, no repeat of the last time."
"Our insurance adjuster was skeptical about the drying scope initially, but COS Water Damage Restoration's documentation — the daily moisture logs, the floor plan with sensor point locations, the before and after readings — was thorough enough that the adjuster approved the full scope without any back-and-forth. That documentation is worth its weight in the claim settlement alone."
"We had a particularly complex drying project across three floors of a Mico office building after an upstairs pipe event. COS Water Damage Restoration managed the zone readings, adjusted equipment as the drying progressed on different floors at different rates, and wrapped the entire building within 11 days with full documentation. That's professional-grade project management."
COS Water Damage Restoration's Mico structural drying team serves Mico and surrounding communities throughout TX. Daily monitoring included. Call +1-844-499-0972 to get started.
Structural drying that's done when it looks done leads to mold. Structural drying that's done when the readings confirm it leads to a genuinely recovered property. Call +1-844-499-0972 and our Mico drying crew brings the instruments and the protocol.
📞 Call +1-844-499-0972 — Mico Structural Drying24/7 Available · IICRC WRT Certified · Daily Readings · Mico, TX